how many stones require for rr masonery work 1cum.
Answers were Sorted based on User's Feedback
Answer / santosh singh
For random rubble masonry work
1.25 cu m of stone is required per 1 cu m work
Is This Answer Correct ? | 24 Yes | 2 No |
how to calculate quantities of sand , cement & aggregate in 1m3 - M20 , 1m2 of 6mm/12mm/20mm plaster , 1m3 20cm/ 1m2 of 10cm brick wall, paint quantity for 1m2 snowcem and lime painting?
3 Answers DCPL, EverSun, Pace Power Systems, Sobha Developers,
"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.
define the authorized overlap in columns
how much lenth of a bar increase when it bends at 90 degree.
What is the zero value in quantity surveying
Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct
0 Answers Suraj Constructions,
Explain the various stages of the project planning process in construction?
does the compressive strength of brick be more then 3.5 n/mm2 or 5 n/mm2?
what is difference between curtain walling and glazing and spider system which are using in building external finish systems.
what type of waterproofing and procedure using in building?
Types of pile, which should be prefer in sandy soil
What is horizon or horizontal mining?