Answer / senthil473

shuttering work of horizontal members are generally called as, centering. centering works are measured in m2. shuttering area = the area of slab (take clear spans for finding area) + total depth of the beam (no. 1 and 3 which are parallel to each other) * the clear span of the slab which is parallel to the no. 1 and 3 beams + width of the beams * total center to center length of the beams + (total depth of the beam + total depth of the slab) * total length of all the beams.

Is This Answer Correct ?    3 Yes 3 No

how to calculate shuttering measurement of beam and slab..

Answer / senthil473

you also may add 5% for wastage.

Is This Answer Correct ?    0 Yes 0 No

how to calculate shuttering measurement of beam and slab..

Answer / senthil473

sorry, sum also the, total depth of the beam (no. 2 and 4 which are parallel to each other) * the clear span of the slab which is parallel to the no. 2 and 4 beams with the above formula.

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

Sir I am from jntuk R13 regulation...... Is there any chance to leave credits

1 Answers   JNTUK,


is basic cost of the material includes tax?

0 Answers  


which grade of concrete according to Indian Standard 800:2007 has highest strength?

7 Answers  


What is labour ratio for construction of residential buildings

1 Answers  


How to find the requirement of cement and sand for the 1cum of rr masonry work

1 Answers   S Tech,






Why we do soil classification?

5 Answers  


Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)

0 Answers   DBL,


How to correct a column which don't have sufficient cover?

1 Answers   Leighton,


How to find the material quantity in a cement Sand mortar for Stone masonry?

1 Answers   HDIL,


What is the difference between pressure pipe and non pressure (NP) pipe?

1 Answers   Infosys, L&T,


whats the concrete mix design ratio for M 35

1 Answers   Rahman Industries, SPRRG,


what,s the clear cover of beam,slab,column,lintel and foundation?

36 Answers   Max Myanmar, Spar Geo Infra, Yashwant Construction‎,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)