Answer / marudhupandi
Its one bundle or aunther
25mm- 1 nos
20mm- 2 nos
16mm- 3nos
12mm- 5nos
10mm - 8nos
08mm- 10nos
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / desigan
Actually bundle is designed for as per labour bearing load. As per is codes one male should lift only 50 kgs... thats why cemwnt bags are coming in 50 kg bags... ok lets see the numbers
25mm- 1 nos
20mm- 2 nos
16mm- 3nos
12mm- 5nos
10mm - 8nos
08mm- 10nos
Is This Answer Correct ? | 2 Yes | 0 No |
Answer / karthik rajendren
One bundle is equal to 2 tons.
For 8mm = 422 nos,10mm = 270 nos , 12mm = 188 nos ,16mm =
105 nos,25mm = 43,32mm = 26 nos 40 mm = 16 nos
The formula is (13500/D*D)per ton
Is This Answer Correct ? | 4 Yes | 4 No |
Answer / shekhar kundena
Approx One bundle weighs 50 Kg to facilitate loading and unloading. Hence, in a bundle of
8 mm : 50/(12.19 x 0.39) = 10 Length (1 Length = 12.19 m)..... similarly,
10 mm : 08 L
12 mm : 05 L
16 mm : 03 L
20 mm : 02 L
25 mm : 01 L
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / sjtbehera
all bundle are 12 pcs. if you purchase from retailer
Is This Answer Correct ? | 1 Yes | 3 No |
Answer / kishor khatri
8dia 15 nos. 10dia 10 nos. 12dia 7 nos . 16dia 4nos. 20dia 2nos. 25dia 1nos.. 32dia 1nos.. 40dia 1nos..
Is This Answer Correct ? | 1 Yes | 8 No |
what is the minimum % of steel use in columns ?
What is 1/8 on the architect ruler denotes?
How to preparation billing for high rise building? anyhow can give the tips
why mixing marble powder reduces setting time of cement
what is grid line? why are we provided small dia reinforcemen in slab against beam n column?
How Can You Design Aisolated Footing Subjected To Tenstion Force?
I need to constructive work in amaraj batteries
explain about earth quake zones? Chennai falls under which zone
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
please know me that required quantity of cement , sand , water and bricks for 1 cub meter of brick work
one cricket ball through in chennai and jaipur same speed where bowl has fast speed