how to calculate shuttering measurement of beam and slab
Answer Posted / senthil473
sorry, sum also the, total depth of the beam (no. 2 and 4 which are parallel to each other) * the clear span of the slab which is parallel to the no. 2 and 4 beams with the above formula.
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
Define What is the difference between routing maintenance and major maintenance in school facilities?
Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....
What is high adherence steel bar? I have a general specification which refers to High Adherence steel bars, coils and meshes to BS EN 10080 and BS 4449 or BS 4483. Is this just general re-bar or is there something different about it? The spec originated in France.
How can we make a hole in a solid rectangle using solidsworks?
what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?
pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width
show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water
what is a well
I have to conduct load test on greting cover, pressure gauge is in kg cm2, how to caluculate load on this greting cover.
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
What things architect have to take care of before starting any project?
Formula for calculating the volume of bulb in underreamed pile
How much quantity of cement,sand,stone used to build 1 cum of cc road??
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?