How to find the no. of main bar in circular footing (Central shaft of CLF)

Answers were Sorted based on User's Feedback



How to find the no. of main bar in circular footing (Central shaft of CLF)..

Answer / poras patel

Dia. of footing= D

Side Cover - C

Specing = S

Nos of bars = D-2(C)/S

Is This Answer Correct ?    6 Yes 1 No

How to find the no. of main bar in circular footing (Central shaft of CLF)..

Answer / jhunu mandal

Dia. of footing= D

Side Cover - C

Specing = S

Nos of bars = D-2(C)/S

Is This Answer Correct ?    1 Yes 1 No

How to find the no. of main bar in circular footing (Central shaft of CLF)..

Answer / imran

2 x rt R2 - b 2
=?
Then - cover
U ll got perfect length of steel

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

how many numbers of 4inch bricks and get consumed in 9 inch BB masonary wall in cubic feet.plz send my below e.mail adress

0 Answers   Quaid-e-Azam International Hospital,


how can calculate the compressive strength of concrete cylinder by water cement ratio ?

0 Answers  


WHY DO YOU WANT TO WORK HERE?

8 Answers  


How to calculate the thickness of the rcc slab?ll u pls tell the formula?

2 Answers  


Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft

0 Answers  






How many types of slabs are there & how to design it?

0 Answers  


how many average of shuttering in one cubic meter concrete

5 Answers  


shape of aggregates used in concrete should be rounded/cubical or elongated/flaky.

9 Answers  


As shown in IS 456-2000 minimum cement content is include fly ash?

3 Answers  


How to calculate cement and river sand material Qty for waterproofing base coat and finish coat

0 Answers  


why the compressive strength of concrete is calculated only after 28 days.why not after 25, 26,27 days..

7 Answers  


Niti Aayog has recently chalked up an action to help India achieving _____ medals in 2024 summer Olympics after dismal performance in 2016 Rio Olympics? A)20 B)30 C) 40 D)50

1 Answers   HPSSSB,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)