what is the diffrence betwen one way salb & two way salb?
Answers were Sorted based on User's Feedback
Answer / sunil kumar
if length/width ratio is greater than 2 one way slab
otherwise two way
| Is This Answer Correct ? | 44 Yes | 0 No |
Answer / sjtbehera
yes length/beradth is > 2 is one way slab and < 2 is two
way slab
in one way slab reinforcement of shorter span is main
reinforcement
but in two way slab both longer and shorter direction is
taken as main reinforcement
| Is This Answer Correct ? | 22 Yes | 3 No |
Answer / sheffin
if l/b ratio is greater than 2-onewayslab
if less than 2 2wayslab
| Is This Answer Correct ? | 20 Yes | 3 No |
Answer / mouna
l/b ratio greater than 2 it is one way slab
l/b ratio less than 2 it is two way slab
| Is This Answer Correct ? | 11 Yes | 1 No |
Answer / rohit gupta
when deflection of slab is predominant in one direction due to irs dimensions it is called One way slab.....
Otherwise if in two directions...it is called as Two way slab,..
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / johnisaaclugtu
When m is lessthan 0.5 the slab is consider one way and it
is supported by two opposite side,when m is morethan 0.5
the slab is consider to be two way and it is supported on
4 sides.m is the ratio between oposite and adjacent side of
rectangle.
| Is This Answer Correct ? | 6 Yes | 9 No |
What is the quantit;(pratical method) of cement, sand, and gravel to be used in M25 grade of concrete for 1000 x 1000 x 1000 mm of sand (for cement please mention in kilos, and for sand and gravel please mention in cuft
what is the stripping time of beam column & slab?
which tests for concrete pouring period at the site?
How to calculate volume of dry mix concrete?
1cubic meter of bricks = ? kg
what is the difference between replacement of cement by groundnut shell ash
how can change 10mm dia @275 c/c bar spacing to 12 mm
Formula of mid span bar
0 Answers Modern Construction Company, PFPL,
How much shuttering oil required for per m2 shuttering by 12mm ply
how many bricks are required for masonary trench having length of 31 mtr, depth of 0.6 mtr and breadth of 0.45 mtr on single brick work as well as double ( 9" ) brick work
i want to know the easy way to find the quantity of steel in a slab , coloumn
during site visit if i find voilation going on,what can i do,how i act?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)