How to find the no. of main bar in circular footing (Central shaft of CLF)
Answer Posted / jhunu mandal
Dia. of footing= D
Side Cover - C
Specing = S
Nos of bars = D-2(C)/S
Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
For fine aggregate which is most suitable River sand or crusher sand & why ?
What is the software used in civil engineering?
What is gravity flow?
1m square 20mm plastering how much of water need curing work
CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL
What is the use of offset command?
what is the most suitable foundation when construct a bird watching tower in a marshy land
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
I need old MMUP exam question and answer for Civil engineering
What is meaning of Canceled/Flat Beam. What is difference between them? Both type of beam can bear same load if size (width)of the flat beam is increases and depth is same as slab thickness? Kindly suggest to me.
Explain how you can turn off the display for dimension in CAD?
how to calculate spacing rod in column
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)
How much for the BRC lapping in full yield and half yield < and which table to get it ?