20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks
No Answer is Posted For this Question
Be the First to Post Answer
Can anyone give me the thumb rule for calculating the time required for construction based on quantity of concrete, Reinforcement, shuttering, etc
How to preparation billing for high rise building? anyhow can give the tips
what is difference between active and passive earth pressure. how it effect the retaining wall design ?
How to test the quality of Ready Mix M20 concrete (1:1.5:3) before casting at site when lorry arrives? Are there any methods?
M40 grade concrete has 40 n/mm2 strength.here what"s mean by n?
what is water cement ratio m10,m15,m20,m25,m30,m35,m40
1 Answers Quaid-e-Azam International Hospital,
point of contraflaxure
what is the effect of duration of earth quake on framed structures ?
How to rectify thermal cracks (2mm wide, 9mm deep aprx. ) developed in tremix finished concrete floor?
howto calculate the quantities of material used in fly ash brick after finding the volume??
what is levelling staff least count
Curvature ki quantity kaise nikalte hai pls give me ans... curvature canal ka hai
0 Answers HR Construction, JP Group,