how to find quantity for binding wire steel.

Answers were Sorted based on User's Feedback



how to find quantity for binding wire steel...

Answer / asmmallesh

There is no formula to calculate quantity of binding wire by practical experience it will be taken as 6.5kg to 9kg per Tonn of steel.

Is This Answer Correct ?    10 Yes 0 No

how to find quantity for binding wire steel...

Answer / lokesha gb

dai wise & space wise as required bending wire so per 1 kg /0.75 to 2.2 sqm

Is This Answer Correct ?    1 Yes 0 No

how to find quantity for binding wire steel...

Answer / hasnain abbas

It is generally taken as 7-8 kg per 1000 kg of reinforcement

Is This Answer Correct ?    1 Yes 0 No

how to find quantity for binding wire steel...

Answer / sekhar ruttala

minimum 8 to 12%

Is This Answer Correct ?    0 Yes 0 No

how to find quantity for binding wire steel...

Answer / fareed

1% of qty of reinforcement

Is This Answer Correct ?    0 Yes 0 No

how to find quantity for binding wire steel...

Answer / monty

100 sqftr per 1 kg binding wire..

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

How much quantity of cement Bag for block masonry (1:4) for 1 cu.m? Block size (150x200x400) Mortar Thickness 20mm

0 Answers  


in one SQM plaster how much Cement and sand consumed in ratio 1:4

0 Answers   ULM,


How many bages of cement used in 1cft?and how we calculat sand and agregats

5 Answers  


what does the grad of cement shows (denotes)?

0 Answers   PBL,


why shear reinforcement is not provided in the design of footing?

2 Answers  






compression strength of first class brick should be

3 Answers  


4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils

0 Answers  


How to check Diameter of Np2 rcc pipe?

1 Answers  


What is the meaning of unit weight of cement?

2 Answers   L&T,


pls give me some basic informations in construction of a structure?

0 Answers   Prestige,


a revised estimate is prepared when the original estimate has exceed by more than 1 percent 2 10 18.40

2 Answers  


Differentiate orthographic and isometric projections?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)