how to find quantity for binding wire steel.

Answer Posted / lokesha gb

dai wise & space wise as required bending wire so per 1 kg /0.75 to 2.2 sqm

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.

1975


In Rcc ratio calculation I wanted to know quantity of Steel also.

1122


if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

1674


How to build the floor to ceiling bookcase?

827


what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.

1744






give me the mix proportion for design mix concrete M 7.5 grade 1:4:8

3610


what is the cost differene of a same structure when it is constructed with brick masonary, and when it is constructed with concrete as a frame structure.????????

1480


column at edge of a framed structure is uniaxial or biaxial. and is an interior column is biaxial

3494


if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

1698


psc girder detail

2716


Bearing capacity of soil determined as per ASTM is to design the foundation size.what is the importance of EV1/EV2 value as per DIN .My consultant ask me to test the the soil as per din to find out this ratio to assess the compacted strength of soil ,,?? is it meaning full ??

1913


relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2

2395


Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)

4556


What are the Types Of DPC and its Thickness used?

959


What is the difference between EPC,DBOOT and BOOT.

23378