Dear sir, my knowledge about cable size determination is limited. Though I read examples I could not calculate the Cable size required for electric driven pump 40 KW, 380 Volt, 50 HZ, 50 meter from transformer and it is three phase star delta starting. Please help as there is no one in my surroundings to help.
No Answer is Posted For this Question
Be the First to Post Answer
What is the fusing factor ?
4 Answers MESCOM Mangalore Electricity Supply Company Limited,
how do you test the capacitor bank ?
advantage of motor design on higher power factor . normally motors are designed for .8 power factor. what is advantage of designing at .88 power factor
In our homes we place the 5Amps fuse...now in our house only takes 5Amps for all normal conditions ha???
What type of pipe material G.I or M.S is used for sprinkler system?
what is the difference between Inverter and ups
Why Powers are named in MW?
What is ment by KVAR and what are the advantage&dis- advantages of KVAR
how to calculate short circuit breaking capacity KA for 2500kva 33kv transformer.
HOW TO CALCULATE THE HEAT AND LOAD OF LT-SUBSTATION WHICH CONTAINS 2*1MVA TRANSFORMERS,LT-SWITCH BOARD,MLDB,ACB,BUSBAR,ETC,......?
What Normal(Tangent) towers and Tension(Cut-point) Towers?
1 Answers ABB, BGR Energy, NTPC, Powermec,
what is the difference between delta delta and star delta connection transformer? why we use delta delta transformer since it need earthing transformer for grounding?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)