HOW TO CALCULATE THE HEAT AND LOAD OF LT-SUBSTATION WHICH
CONTAINS 2*1MVA TRANSFORMERS,LT-SWITCH
BOARD,MLDB,ACB,BUSBAR,ETC,......?
No Answer is Posted For this Question
Be the First to Post Answer
Should transformer earthing pit, to be connect to earthing mat in Substation
The coulomb is a unit of:(a) Energy(b) Voltage(c) Power(d) Quantity of electricity
Why dose an electric meter record KVA when there is no load on a 500 KVA transformer
what are the particle used along with silica gel in transformer breether,explain their functions.
with 3 phase board on a 63 amp rcd is it ok to have 6 electrical showers 2 on each phase and what problems could happen
What is the magnetic field (coil DC ) of Turbo Expander?
why should small green grass ans small plant should not be there inside the transformer Yard in the factories
How to calculate the cable size in sq. mm. when the load is given in KW?
What size cable (based on voltage drop) is required to supply a 40 A three phase boiler if the wiring system is 75V single insulated cables installed in non-metallic rigid conduit 56m from the main switchboard? Voltage drop in the consumer's mains is 8V.
What are the precautions to be taken before working on a cable?
what the effect will occur if we increase the airgap in induction motor
induction motor. we have a three phase supply from diffrent source like R= transformer. Y = DG sets. B = ups. if motor is runing.