Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how to calculate the steel?

Answers were Sorted based on User's Feedback



how to calculate the steel?..

Answer / tariq

D2/162

Is This Answer Correct ?    17 Yes 0 No

how to calculate the steel?..

Answer / prashanth

Do you mean for calculating Reinforced Steel or Structural steel.

For Reinforced steel:-

Area of Steel bar x Length x unit weight 7850

Ex:- 10mm dia of steel

Area=(3.14x 10 x 10)/4
=78.5mm2
Area in Sqmt=0.0000785

Assuming 1mtr length

=0.0000785 x 1 x 7850
=.616 Kg/mtr

Is This Answer Correct ?    16 Yes 0 No

how to calculate the steel?..

Answer / narayan rijal

steel calculated by tonns, kgs etc
in general weight of steel is carry out by an imperical formula=dia*dia/162

Is This Answer Correct ?    1 Yes 0 No

how to calculate the steel?..

Answer / rv

Area of Steel bar of dia "D"= (3.14 X D X D)/4

Is This Answer Correct ?    1 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh

0 Answers  


What is rate of concrete surface rendering work per sqm

0 Answers  


How to convert N/MM2 TO KG/CM2

2 Answers  


what is the difference between tsp & tower

0 Answers  


what do you mean by ssd how it calculated

3 Answers  


what is spt

2 Answers   L&T,


what is difference between curtain walling and glazing and spider system which are using in building external finish systems.

2 Answers  


hi guys what happens if you are absent for a supplymentry exam?

0 Answers  


In csae of hume pipes NP stands for Non Pressure bur what does it really mean?

0 Answers  


What quantity of 1.0 m3 bricks required?

0 Answers  


Formula for Calculating the Quantity of eccentric footing

1 Answers   NCC,


How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)

0 Answers   Wonderla Holidays,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)