How much wastages taken in
1. cement
2. steel
3. fine aggregate
4. coarse aggregates (10mm, 20 mm)


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Civil Engineering Interview Questions

What are the tests to be conducted on cement?

5 Answers   RRB,


How much will be Concrete required for one Sq.meter of area for building work?

2 Answers   PSD, SMC, Tudor Infrastructures,


asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream

0 Answers  


WHAT IS DIFFERANCE BETWEN TOR STEEL AND TMT STEEL

1 Answers   ONGC,


how much CM required for Random Rubble masonry in CM 1:6

1 Answers  






In IS:456-2000 the workability of concrete is given in mm (slump)in cl.7.1. In IS:10262-1982, cl.3.3.4 & table-6 says +/- 3 percent adjustment is required in the quantity of water (calculated as per table-4 or 5), for each increase or decrease in the value of compacting factor (i.e. workability of concrete) by 0.1. How it is possible to calculate the exact quantity of water required for a particular grade of concrete? What is the relation between Slump & Compacting factor of concrete?

1 Answers   Unitech,


Pls help me to arrive the rates for centering shuttering for highbay using H-frames?

0 Answers   Akshaya,


The portion of a brick cut across the width is called?

0 Answers  


Why is concrete cube test carried out?

0 Answers  


if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????

0 Answers  


How to calculate the cement, sand quantity for plastering? (10'x10')10mm thick ratio 1:5. wht"s the formula?

35 Answers   Adarsh Developers, Amrapali, Ganesan Builders, MAHINDRA, NCC, Olympia Infratech, Omex, Ozone Group, Papni Associates, Perfect Arts, PPEC, Raj Construction, Ramky, Skyline Builders, VRR Builders & Developers,


Process of pcc in wateredug

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)