in levelling operation
the first site on any change point is back site
the second site on any change point is fore site
the line commenses with fore sight & closes with backsight
the line comensses with back sight & closes with fore sigh
No Answer is Posted For this Question
Be the First to Post Answer
1. How do you handle non-productive team members?
Define Who designed the city of Washington DC?
Slump Values for works?
0 Answers Aditya Constructions, SVS Constructions,
Can i have pumpable mix design for M10 concrete without fly ash with OPC 43G cement?
How is calculate the cube molt
what is the defination of an ideal fluid?
in which code refer the change of reinforcement dia defer to drawing . i.e. 12mm dai into 16mm dia.
Why we take 162.2 in (d*d/162.2) to calculate weight of steel???
why loss of strength in concrete in 7 days cube test i am not geting mim 7 days strength that is 67 percent for M-35 and my mix design is perfect there is no doughty,and my results are near to 7days percentage but not 67 percent.
4 Answers UPPSC Uttar Pradesh Public Service Commission,
1.WHERE THE SLAG CEMENT IS MAINLY USED. 2.FOR GOOD CONCRETE MIX OF M20 GRADE , CAN IT BE USED? 3. I WE USE FOR BRICKWORLiK AND PLASTERING ANY DISADVANTAGES?E
how many jack required in1sqm area
What is creep ,deflection and shrinkage in concrete