How much quantity of steel will be used for commercial
building consists of ground floor shops, first floor shops,
second floor will be for offices and third floor will be
office/banks. How many tons of steel is required to
construct this building.
Answer Posted / rajesh kumar
63Metric tons
Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
calculate the quantity of water for 1:6 cement mortar
660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need
why are you joining in this (applied post) job and your aim for this job
What is change order request?
how to calculate the concrete mix m30 by volume
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
define the strength
Why is the use of granular sub-base in concrete carriageways not preferred, explain?
What is the meaning of soil reinforcement?
in 100 cft = 1350 bricks in 100 cft = ? bloks
How much is the cover for slab?
What are the different types of runners?
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?
How can I make justification between using concrete grade c35 compare c37?
explain fie benefits of using standard terminology in the measurement process