How much quantity of steel will be used for commercial
building consists of ground floor shops, first floor shops,
second floor will be for offices and third floor will be
office/banks. How many tons of steel is required to
construct this building.

Answer Posted / ramesh

.12% to .15% of area of that building measurements to metric tonnes

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Explain the Strength of brick?

660


which software is better for design and analysis of buildings (stadd pro ) or (Etabs)

1838


what will be density of a cement bag if its weight and volume are 50kg and 1.25 cft respectively???????

1662


What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...

1537


Pls provide me with the calculation or codes related to de- shuttering of flat slabs

5920






Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.

1260


CAN WORK WELL UNDER DEAD LINES OR PRESSURE?

1499


How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work

3148


What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?

2919


How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?

1044


What are the causes of building collapse?

662


Trapezoidal section footing calculation of Volume & its Area

31990


suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?

1668


what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.

1743


how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?

1988