In Transformer testing at Shop test we normally test for
vector group, open ckt.,short ckt. but what are the other
test performed for transformer once it reaches at site.For
e.g:if the transformer is dry having rating 1000KVA?

Answers were Sorted based on User's Feedback



In Transformer testing at Shop test we normally test for vector group, open ckt.,short ckt. but wha..

Answer / guest


1. Insulation Resistance Measurement
a . For LT systems, use only 500V or 1000V Megger
b. For MV & HV systems, use 2500V or 5000V Megger
c. Remove Earth from Transformer neutral
2. Winding Resistance Measurement
R-N AND r-n
Y-N y-n
B-N b-n
3. Magnetic Current Test
Applied Voltage : RY YB BR
Measured Current : R Y B
4. Magnetic Balance Test
5. Vector Group Confirmation.
6 . Short Circuit Test and Differential Stability.
7 . REF Stability Test
8. Cooler Circuits.
9. Auxilliary Protection Circuits

Is This Answer Correct ?    2 Yes 0 No

In Transformer testing at Shop test we normally test for vector group, open ckt.,short ckt. but wha..

Answer / brahma

Also Double voltage double frequency, if customer ask impulse

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

Transfer function is == ? a. Mathematical model b. System with no physical structure c. Can be calculated through differential equations

1 Answers   CCP,


how does excitation of brushless alternator took place?

1 Answers  


what is the purpose of fuse?

7 Answers  


Show the schematic arrangement of diesel power station layout and give its principle of operation.

0 Answers  


why dc series motor has high starting torque

2 Answers  






What is the size of a 60 watt and 80 watt tubelight?

0 Answers  


what is lrs tank water resistance.

1 Answers  


why does rotor rotets?

0 Answers   IBM,


How to convert resistance value at 20 degree to 90 degree?

2 Answers  


What is critical disruptive voltage?

0 Answers  


In radial network the source is fed from 1 end both ends at central

0 Answers  


The knee point of a current transformer is normally unique and known.So why in the nameplate of a CT they put the minimum value like this Vk> 400v.

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)