How many different between estimated quantity and practical
work at site.
where cross hairs in surveying telescope are fitted
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
how to clculate the %of concrete strenght achive after curing?load
0 Answers L&T, RJ Construction,
Given a selection of 28 day cube test results for concrete placed of design mix C 35 and not all of which are greater then 35 MPa, how does one decide if the concrete in place is satisfactory. Are there a minimum number of cubes that need to be tested to decide that?
At which place Construction joint should provide in slab and Beam at the time of casting.
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
how many types of survey and what are levelling instrument?
beam is fixed at both end which is 8 m span carry udl of 10 kn/m at left half span.there is internal hinge at center.what is reaction at center
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
Soil Mechanic: You are building a gravel road. How much water do you need to mix in compact 100 m3 of road quantity borrow pit gravel?
Why are L-beams (cast monoloithic with slab)that usually occur at the slab edge, provided with overhangs?
Define What is made from large rocks, which protects the base of cliffs?