What is Pavement & carrage way?
Answers were Sorted based on User's Feedback
Answer / m.chandra shekar
PAVEMENT includes road for vehicular traffic, foot path, shoulders...
CARRIAGE WAY is the part of pavement used for vehicular traffic movement...
Is This Answer Correct ? | 27 Yes | 4 No |
Answer / vinayak
Pavement- it s a structure that consists of different layers made up of composite materials laid evenly on a prepared natural soil sub grade.primary function of pavement is to distribute v load stresses evenly over lower layers.
carriage way-middle part of pavement used for vehicular traffic movement.
Is This Answer Correct ? | 11 Yes | 0 No |
Answer / liton1_06
pavement:-same meaning of carriage way, surface of road.
carriage way:- The width of the roadway constructed for the
movement for vechilcular traffic is called carriage way or
pavement.
Is This Answer Correct ? | 14 Yes | 6 No |
Answer / s.p. singh
carrage way is indicates the portion of road awailable for the moovement of traffic & pavement is the part of crust for road it has mainly two types 1- flexible pavement 2- rigide pavement.
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / narendra
(from wikie)
A Pavement:- the durable surfacing of roads and
walkways ("road surface" in British English)
A carriageway is the part of a road that will
actually carry vehicle traffic.
• the carriageway surface is called the pavement (in
American English)
Is This Answer Correct ? | 4 Yes | 2 No |
Answer / s. k. rao
Any material or materials stronger than natural ground and
laid over it in layers to protect it from being
overstresssed due to vehicle loads is pavement.
Carriageway is the demarcated middle part of pavement
surface of sufficient width intended for vehicular traffic
movement.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / santosh
pavement: tha top surface width of road which constructed
by hard material & its primary function is to provide non
interrupted way moving of vehicles only.it also termed as
carriage way as it is made for movement of vehicles only.
Is This Answer Correct ? | 3 Yes | 6 No |
pls give the grads of concrete and the ratios to the same
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
How to calculate the area of a irregular sized land in square feet?and what will be the total area of this land South-51.1ft , North-47.7ft , East-53.3ft , West-54ft ?please explain me how to calculate?
0 Answers AIZAZ General Contracting General Maintenance, GK Realtors,
How to calculate soil bearing capacity of soil?
how bitumen is prepared for NH,SH &other roads
What is Lean Concrete?
what is mean by splice length? As there were any formula to calculate the splice lenght?
why we designed limit state method?
What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?
how many kg of gypsum required for 100 sq.ft wall (thk of plaster is 12 mm)
1 Answers Indu Projects, Tata Tiscon,
how to prepare the bar bending schedule for a given rcc material?It will be more helpful if you explain me with an example?
How and where are aqueducts built?