1.How much batten required for 1 sqm Shuttering.
2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
No Answer is Posted For this Question
Be the First to Post Answer
(Project Management Topic) What are the important criteria in the successful realization of the project?
in BUILT UP AREA BASIS WHAT IS RATIO OF CONCRTE & STEEL RATIO MAY BE CONCIDER IN PER SQFT QTY
what is high type road and low type roads
how do we design mix ratio?
std ht of wallmixer from ffl
what is ph value of water
Define What is the distance between railway tracks?
Our IDCT industrial cooling tower height is 15 mtres so need to RCC structure stability test as par any IS Standard or Indian act.
hai,i completed my b.tech civil.Recently i wrote the appsc exam for managers water supply engg.I want answers for general studies and civil engg paper2.If any body know or written that exam send to my mail id is ruksana.sk08@gmail.com.
what is tacheometry?
at the beam-column junction point tell me how much beam bars should pass through column ring ? 3 or 2 or 1 . answer with reason. if it is not happen then what will be he effect ?
Lime used for white washing is- (1) quick lime (2) Hydrated lime (3) caustic lime (4) lime milk