How many different between estimated quantity and practical
work at site.

Answer Posted / ratheesh

overall 5%

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Are cruise ships built for the transatlantic run?

758


use ofr concrete as per grade ?

1638


why development length = 50D . why not 100D

1478


What is the meaning of a blue land surveyors flag?

779


how to caluclate sienerge qty in construction in ap

1939






5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)

1657


How many lbs are there in a yard?

674


Define What is made from large rocks, which protects the base of cliffs?

659


how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm

1542


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

2390


What expenses counted in contingencies and how much it is in related to built-up area of the building.

1307


plumbing CPVC fitting FTE Brass full form

2132


What is an ortho mode?

716


Define What is the best type of wood glue?

657


What was asked in isro civil interview

499