How many different between estimated quantity and practical
work at site.
Answer Posted / ratheesh
overall 5%
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
pls tell me , what is the water content
How to build the floor to ceiling bookcase?
100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags
How much material will consume for following specification water tank (9*7.5*6 feet)?
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.
why the profile of shell of natural draught cooling tower is hyperabolic.
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
for pretensioning which will yield first and same for post tensioning?
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
Time required for curing of wall tiles before fixing
What is the general specifications of a bituminous pavement road?
What is the primary difference between adsorption and absorption?
Pls help me to arrive the rates for centering shuttering for highbay using H-frames?
Basic questions of civil engineering
what is work of planning deptt. in any construction compny (in road project)