What is the difference between EPC,DBOOT and BOOT.
Answer Posted / surya v kuchibhotla
In the EPC system, funds will be provided by the client
based on the client's estimation.The contractor has to
execute the project as per the scope of the client. In the
BOOT, the funds shall be of contractor's and based on
project viability, the contractor can collect fee from the
users for a specified period to get back his funds.
Wherein, the designs will be specified by the client. In
the DBOOT, contactor can do value engineering based on the
scope of the project and can get back his investment as in
the case of BOOT.
Is This Answer Correct ? | 15 Yes | 2 No |
Post New Answer View All Answers
what is cross hair cursor?
if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????
what is hydrostatic paradox?
estimate quanitity of bricks(19x9x9cm without mortar), cement & sand in 10feet X 10feet wall ?
what is the cost differene of a same structure when it is constructed with brick masonary, and when it is constructed with concrete as a frame structure.????????
what is thumb rule for calculating the size of ISMB required for a particular length of span
do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?
Define What is the distance between railway tracks?
from where ican get sample papers for CET-delhi 2012
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
what are the proper pipes for salt water line
trapozidal
For what purpose bedding is used under storm water drains, explain?
one steel fixers how much ton steel fabrication he will do same how much tone he will binding?
"Gates of the dams are generally designed of curved shape". Why?