what is steel consumption for high rise building column, beam, slab,footing..

Answer / s.k.roy

Based on experience the Consuption for a Building of 10-15
Storey :
Beams 125-140 Kg per cu.m of Concrete
Slabs 80-100 Kg per cu.m of Concrete
Columns 350-400 kg per cu.m of concrete
Footings100-125 Kg per cu.m
In general for a Eartquake Resistant Str in Zone 3/4 the
steel consumption can vary between 6.5 to 7.5 Kg per
sq.feet of Constructed area

Is This Answer Correct ?    29 Yes 7 No

what is steel consumption for high rise building column, beam, slab,footing..

Answer / lalit lone

The overall consumption up to 20 stories residential
building is around 5.5 kg per sqft.

Is This Answer Correct ?    9 Yes 1 No

what is steel consumption for high rise building column, beam, slab,footing..

Answer / b.sankararaman

Footings generally will have 50 to 80 Kg/Cum. Other
components are fairly accurate

Is This Answer Correct ?    9 Yes 3 No

what is steel consumption for high rise building column, beam, slab,footing..

Answer / rajesh kumar jha

Column:- 160 kg / cum
Beam :- 110 Kg / cum
Footing :- 80 Kg / cum
Slabe :- 80 Kg / Cum

Is This Answer Correct ?    1 Yes 1 No

what is steel consumption for high rise building column, beam, slab,footing..

Answer / sachin

100 to 120 kg/cum

Is This Answer Correct ?    3 Yes 6 No

Post New Answer

More Civil Engineering Interview Questions

What's mean fe of steel?

1 Answers   Fernas Constructions,


what are all the new civil construction materials?what are the new concepts ?

2 Answers   Essar,


Why are steel plates inserted inside bearings in elastomeric bearings?

0 Answers  


9*9 1:4:8 ratio using how to calculate the material for 40mm aggregate ,cement &sand please tell me answer

5 Answers  


advantages & disadvantages of using crusher dust instead of sand in r.c.c work

3 Answers   L&T, Shm Consultants,






why no deduction for steel is made in the volume of concrete?

3 Answers  


What is meaning of FREE STANDING STAIRCASE ?

0 Answers   UPCL,


How can i calculate the amount cement, steel , sand nd aggregate reguired for 1000 sq ft of r.c.c?

2 Answers   Agrawal Construction,


Define Workability ?

0 Answers  


how i can tak Quantity of mortar in block work

0 Answers   DLF, LiveCon,


In case of columns the cover is from main steel or from stirrup & which is the IS code mentioned in it?

2 Answers  


concrete coverings outside steel

13 Answers   Jain Housing, L&T, Supertech,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)