Whr is use tierod???what is standard size of it

Answers were Sorted based on User's Feedback



Whr is use tierod???what is standard size of it..

Answer / kapil

1)Tierod is used in R.c.c. work like retaining wall, column
beam (if more than 1m height normaly)paradi & heavy R.C.C.
work.
2)Normally it is more than 1m.

Is This Answer Correct ?    7 Yes 2 No

Whr is use tierod???what is standard size of it..

Answer / saif raza

1# Tie rod is generally use as a horizantal member for
supporting of column,shear wall or any other horizantal
structural member shuttering.

2# Size as diffrent & starting from 500mm to 3000mm.

Is This Answer Correct ?    3 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

how to create our resume?

0 Answers   Sunraj Construction,


Q:What is the formula of bar to bent the slab in bent slab? Second question Q: what is formula to calculate the hook?

8 Answers  


When was the first motorway built in england?

0 Answers  


WHAT IS MEANT BY AEOLIAN SOIL?....

4 Answers   L&T, Totem Infrastructure,


what is thumb rule exactly?

2 Answers  






List out some of the software used in the construction sector to estimate cost and monitoring expenses?

0 Answers  


Kindly tell me how much extra steel bars are provided in a RCC roof and distance of bends in different sizes of roofs. Please also tell me that bars provided in chajja are taken seperate or main bars or short bars are extended in chajja. please send me the answer@ suhail_akhter@hotmail.com

2 Answers  


Used Cement Mortar, Cement & Sand in 1 Square Meter or 1 Square Feet For 10-18mm Thick Plaster ? (1:6) (1:4)(1:3)

3 Answers   IVRCL, L&T,


Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40

10 Answers   ACC, Awasthi Construction, Bitulink, Mir Akhter Hossain, SOT,


Can rice husk ash be used instead of coal fly ash for manufacture of clc/ foam concrete

0 Answers  


what are the criterias for designing a school lab? for e.g a chem lab.Does it depend on room size or no. of students?

3 Answers  


what is periode of deshuttering of slab our span length 21m,and width 2.5m grade of concrete M-35

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)