It needs contour survey before plastering a wall / column &
floor tiles setting to get––
Answer / sjtbehera
Yes, because there are very undual surface, honeycomb are there. It need to rectify.
Is This Answer Correct ? | 0 Yes | 0 No |
What is Flat/Canceled beam, What is difference between them? can bear same load? kindly suggest me
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
How much cement,sand,bricks and water needed for 1square metre brick work?
what is the quantity of cement,sand and aggregate in 600*600*1600 mm in 1:4:8
How will you determine the capacity of a reservoir with help of contur
HOW YOU CAN DETERMINE THE WEIGHT PER METER OF STEEL RODS EASILY?
How much binding wire is required for one tone reinforcement ?
21 Answers ARS, Gammon, L&T, Lodha, Pratibha Industries,
How we decide the the load combinations for design of RCC structures?
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?
does a b.tech civil engineer fresher supposed to know how to design rcc structure?