1)pile is of 200mm dia.-- a)tell the cutting length of ring
considering 2cm cover b) tell the quantity of concrete
considering pile length as 3m c) tell concrete quantity in
bulb

Answers were Sorted based on User's Feedback



1)pile is of 200mm dia.-- a)tell the cutting length of ring considering 2cm cover b) tell the quan..

Answer / rohit

Mr. Srinivas,

Can u tell the calculation formula.


Regards,

Is This Answer Correct ?    4 Yes 0 No

1)pile is of 200mm dia.-- a)tell the cutting length of ring considering 2cm cover b) tell the quan..

Answer / srinivas.m

1) 22/7*(d*d)/4*3

2) 22/7*.16

Is This Answer Correct ?    4 Yes 1 No

1)pile is of 200mm dia.-- a)tell the cutting length of ring considering 2cm cover b) tell the quan..

Answer / srinivas.maradana

1)The 200 pile reinforcement cuuting lengtg 050mtr with
lap060 mtr
2)the qty is 00942 for 3 mtrs

Is This Answer Correct ?    1 Yes 4 No

Post New Answer

More Civil Engineering Interview Questions

What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.

0 Answers  


What are the defects in concrete?

3 Answers   L&T,


What is the difference between lap splice length and development length of rebars?

4 Answers  


How many square meter can mason layout chb per hour

0 Answers  


How much Strength of the cube can attain in 7days comparative 28 days strength?(as per IS code) ( specify the ref.clause also)

8 Answers   CCCL, L&T,






Hi, Please tell me the ISI specification for the duration of concrete to achieve full strength of concrete. Is it 28days?

7 Answers   UPSC,


12mm diameter iron bar having 1m length how much kg weighted ?

6 Answers  


A beam having top bars 20dia,bottom bars 16 dia.is the design is ok? In which case this applicable?

6 Answers  


As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.

0 Answers   Finance,


In cement concrete pavements why cracks are develop aolng with logitudinal&tangenteal directions

5 Answers   L&T,


cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?

0 Answers   L&T,


what is the concrete grade for 1034.13N/mmsq

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)