in a mix if desired concrete slump is not obtained , the adjustment of each concrete slump difference is made by adjusting water by which percentage
Answers were Sorted based on User's Feedback
Answer / kailash sankhala
1% adjustment in w/c ratio, cement content
2% adjustment in aggregate content if desired slump is not obtained
Is This Answer Correct ? | 9 Yes | 1 No |
What are the different types of foundation?
I have an span length 16 ft c/c
mix design procedure for 1:6 cement mortar
what is the proportion of M25 geade cincrete.?
What is the difference between simply supported beams and cantilever beams
2 Answers Osmani Constructions,
what is kribs is supporting?
A floor has to be removed partially with block work tying floors together, can block work continue on floor that has to removed excluding demolishing works tying floor from underside of slab and top of slab demolishing floor upon completion?
What is the cement and sand consuption of 1:4 block work
how can u extent the final setting time of cement?
3 Answers TNPSC Tamil Nadu Public Service Commission,
What us meant by DLP & liquidated damages in civil quantity surveying
Aptitude, reasoning, quants, verbal and technical question
what is the number of cement bags (50 KG) required for concreting 1000 Square Feet Slab . Thickness of slab 4 inch.
4 Answers Gammon, LNN, Ramky, TATA,