1)pile is of 200mm dia.-- a)tell the cutting length of ring
considering 2cm cover b) tell the quantity of concrete
considering pile length as 3m c) tell concrete quantity in
bulb
Answer Posted / rohit
Mr. Srinivas,
Can u tell the calculation formula.
Regards,
Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
how do we design mix ratio?
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
Coverage of 25mm.thick ratio of 1:4 cement mortar?
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
Define What is diversion tunnel in a dam?
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
Difference between pre-tensioning and post-tensioning.
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
How you read 5x3x1 #4 @ 20" 0/C in steel structure?
If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US
what is the metal ratio in granular subbase coarse for one cum ? And please explain the morth table ...what is the difference between grading 1 , 2, 3 what it means..plz explain
Why the statue of liberty is made of copper?
what is the use of beam end forces while using a staad ? wha they are show
give me the mix proportion for design mix concrete M 7.5 grade 1:4:8