what is installation and commissioning of (fat & sat) of
power plant dcs ? this question keeps in desirable
conditions of one company .
No Answer is Posted For this Question
Be the First to Post Answer
What different types of problems do occur while doing the loop checking? and please explain in detail or mail me at kadam.aniket143@gmail.com
1 Answers Operational Energy Group, Process Control Technologies,
How to rerange a dp type level transmitter after installation?
What is an instrumentation amplifier? How is it better than a differential amplifier when handling outputs from a wheatstone's bridge?
what is Micro-switch and where it is used......?
What you mean by multi stage control vavles?
how flame detectors sense the flame.
what is commissioning & pre commissioning , explain with difination
2 Answers Bapco Bahrain Petroleum Company, Shell,
In the field and in the control room different power supplies if used How to handle the ground
What is mean by AC voltage and DC voltage
Hi my friends Is any one who can assist me in knowing the typical interview questions for system engineer at General Electric pty Ltd
who discoverd ohms law?
give classification of transducer based on type of application
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)