what is installation and commissioning of (fat & sat) of
power plant dcs ? this question keeps in desirable
conditions of one company .
No Answer is Posted For this Question
Be the First to Post Answer
If the average power during generation is zero, why do the analog meters have + and - ?
Identify the electrical variable that is either directly or inferentially used by various instruments to determine the value of a measured variable.
If the on Of the DO module is off in the System cabinet, then what is the Procedure to check weather the Module is working or not.
Hi i am aneesh, done btech in applied electronics & instrumentatiin. And then i took mba in finance & marketing.After that i got placement in finance co and worked there for 3.5 yrs.Now i wanted to come back to engineering job.But without engg experience, i may not able to find an opening.i have done a course related to flow meters and ite calibrations. Kindly suggest where should i try to get a job?
how to calculate the temp. of RTD&Thermocouple when we got some mV r Ohms?if anybody has d chart pls mail the chatrs to me...
How to Calibrate Radar Level Transmitter in Field
What are continuances of connecting earthing and shield of branch cables (instrument to Junction box), at the same earthing pot provided on JB? Is it ok, or may produce some problem?
0 Answers Process Control Technologies,
steps for installing orifice plate?
0 Answers Bhushan Power Steel,
all types of liquid analyzer principle with drawing?
How to define the size of control valve?
if conical type tank in top LEFT side solid material coming but LT MOUNTED IN TOP OF LEFT SIDE, how to measure ultrasonic level transmitter ?
what is KV and XV valve