What is BOQ why to calculate BOQ
Answers were Sorted based on User's Feedback
Answer / mohd hashiruddin
BOQ is defined as the bill of quantity
in quantity surveying BOQ is prepared to show the cost of the material like no of cemnt bag, sand, brick,etc in a single sheet and sum is added to give the required rate for the various quantity
bill of quantity can be prepared separate for substructure and superstructure
Is This Answer Correct ? | 12 Yes | 2 No |
Answer / b.nagaraju
BOQ -bill of quantity
Bow:- this purpose lot of use
1)required metrials
2) using materials
3)Balence of metrials
4)rates of market
5)monthly bills loss or profit.
All things are coming and project status.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / nafees
BOQ is basically we used for find out the quantity of materials whatw e used in constructions. like brickwork , cement, sand and RCC materials.
Is This Answer Correct ? | 0 Yes | 0 No |
Soil is clay
20. Do you adapt easily to new environment, job?
How much actual % of wastage of steel.
wha is frog?
I had a plot of say 5000 sq.ft. and soil in the plot is normal soil. Now I had to work upon the tender quantities to prepare a preliminary budget within a day. Is there any thumb rule or assumptions to calculate the quantities which can differ upto 15% +/-?
What is reinforced brick masonary and its advantages and applications, arrangement of steel
if i want to change the dia of some bar in a structure,then which formula should be used to find the spacing for the bar of new dia?
In which year onward limit state method used in india...
What is the strongest bridge for a school contest?
what is the cut length for Fe 500?
why we are condecting the slump test for concrete?
what are the forces acting on gantry girder