How to calculate cement and sand quantities in cement mortar
As 1:1,1:2,1:4,1:6 ?
Answer Posted / syed mahaboob hussain
the procedure to calculate quanity is given below
RATIO (1:6)
NOTE = 1:6: 0.55(Water) = + (7.55)
CEMENT = 1m3/7.55 x 1 = 0.132m3 (No of Kg = 0.132 x 1506 =
198.792kg)
Sand = 1m3/7.55 x 6 = 0.794m3 (No of Kg = 0.132 x 1650 =
437.250 kg)
Water = 1m3/7.55 x 0.55 = 0.072 m3 ( No of Kg = 0.072 x
1000 = 72liter)
Is This Answer Correct ? | 20 Yes | 52 No |
Post New Answer View All Answers
what is the specific gravity of rubble in plum concert
What is thumb rule for deep trench excavation
What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?
What are the composition of a landfill?
what is the cost of rcc roof casting of 400 sq. ft. in kolkata
i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI
which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?
how much tempareture are required to make liquid state of pid leed
What is the Maximum %age of Steel in columns and beams ?
Please Clear My doubt . We Can Design the size of the beam by manually by the Length of the beam...What is the technique adopted
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
Explain major difference between auto level and dumpy level?
can i make bricks using M10 grade concrete ? and what would be the cost of a brick if we use m10 grade concrete sand and aggregates ??
For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.
What is change order request?