How do we calculate the building footing calculation ?
Answers were Sorted based on User's Feedback
Answer / ds raju
Question is not clear. Is it design calculation ? or RCC
volume of the footing.
Design calculation depends on the safe bearing cpacity of
the soils and load on the footing.
Concrete volume can be calculated based on the shape of of
the footing.
For Rectangular/ square type : LxBxH
For Trepezoidal type : h/3 (Area at bottom-A1 + Area at top-
A2 +SqRt of (A1xA2)
| Is This Answer Correct ? | 36 Yes | 2 No |
Answer / r.vandhana
the calculation varies for each type of footing
| Is This Answer Correct ? | 24 Yes | 4 No |
Answer / sachin kesarkar
FOR RECTANGULAR FOOTING VOLUME= L*B*H
WHERE L=LENGTH B=BREDTH H=HEIGHT
FOR TRAPEZOIDAL FOOTING VOLUME=h/3(A1+A2+ROOT A1.A2)
WHERE h=HEIGHT A1=TOP SURFACE AREA A2=BTM.SURFACE AREA.
THERE ARE ALSO THE FOOTINGS WHICH ARE NOT PERFECTLY
TRAPEZOIDAL, IN THAT CASE WE HAVE CALCULATE IT WITH
TRAPEZOIDAL HAVING 5% VARIANCE.
| Is This Answer Correct ? | 20 Yes | 4 No |
Answer / srinivasan
1) FOR RECTANGULAR OR SQURE PORTION L X B X H WHERE L=
LENGTH B= BREADTH, H= HEIGHT
2) TRAPEZOIDAL PORTION H/3 (A1+ A2)+SQRT (A1*A2)
| Is This Answer Correct ? | 9 Yes | 2 No |
Answer / guest
width of footing can be calculated as
w= 2*l + 30
depth of footing can be varied as soil change
| Is This Answer Correct ? | 3 Yes | 9 No |
Answer / guest
Dear friends generally we do this footing calculation like
this two method =
(A)1st method =i)1.500 m x 1.500 m x 0.500 m = 1.13 Cum.
ii)½ x ( 1.500 m + 0.250 m ) x 1.500 m x 0.200 m = 0.260
Cum. (B)2nd Method =i)(1.500 x 1.500 x 0.200)+ (0.250 x
0.250 x.0.250)= 0.460 Cum.
ii) ( 1.500 x 1.500)+ ( 0.250 x 0.250)/2 x 0.200 = 0.231
Cum.
( But I think it is not proper procedure so please you do
properly )
| Is This Answer Correct ? | 10 Yes | 33 No |
all technical question
What are some structures that may be subjected to fatigue?
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?
8mm steel not available at site used bar 8mm and 150cc please tell me specing i used 10dia bar write formula please
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
mix design concrete m30 for elevated water tank
How much lap length provided in compression and tension in bridges?
bar bending schedule?
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
If in a structure, e.g, 20mm steel bar is not available and we use 16mm steel bar instead of 20mm bar, how can we calculate the no. of steel bars for 16mm diameter bar?
Can we provide lapping of R/f steel for plinth beam in support portion(At column)?
how many meters for brad gauge?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)