if a pipe those configuration (ASTM c 76 class b 450mm dia
2500mm length) fixing for water course those lining of water
is 7000 running meter.
my question is that if 8 joints of pipe ls leakage and we
have not permission to stop the water so which treatment we
apply on joint in that in condition.
No Answer is Posted For this Question
Be the First to Post Answer
Steel Calculation for Footing, Beam & Columns?
What's mean fe of steel?
1 Answers Fernas Constructions,
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
Please provide detail I.S standard code for using crush sand instead of river sand for plaster and concrete grade M15, M20, M25 and M30 and its mix design
1 Answers JPMorgan Chase, Sobha Developers, Structwel,
What is unit weight of 1st class bricks ?
Minimum concrete cover in slabs, columns, beams, foundation and other st?
what"s the minimum content cement allowed in RCC?
11 Answers ABC, L&T,
how do we calculate wastage of steel in the site,what r the items to taken into account for wastage calculation?
insted of bentonite we can use any alternate material in piling ?
what are the duties of Site Engineer in work site?
0 Answers Amarprakash Developers,
How many jacks and props required for one floor, or tell me any thumbrule...to know the approx jacks and props required.?
What is the significance of cost estimate knowledge for an architect?