How do we calculate the building footing calculation ?
Answer Posted / guest
Dear friends generally we do this footing calculation like
this two method =
(A)1st method =i)1.500 m x 1.500 m x 0.500 m = 1.13 Cum.
ii)½ x ( 1.500 m + 0.250 m ) x 1.500 m x 0.200 m = 0.260
Cum. (B)2nd Method =i)(1.500 x 1.500 x 0.200)+ (0.250 x
0.250 x.0.250)= 0.460 Cum.
ii) ( 1.500 x 1.500)+ ( 0.250 x 0.250)/2 x 0.200 = 0.231
Cum.
( But I think it is not proper procedure so please you do
properly )
Is This Answer Correct ? | 10 Yes | 33 No |
Post New Answer View All Answers
How much percentage of brick bats allowed in CD-75 bricks
What are the types of slump?
How to make a c++ program that converts any base to base 10?
What is the worlds largest concrete dam?
crank types
I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?
Draw the cross section of a boundary wall and label its part with detailing?
what is the composition of good brick ?
How is calculate the cube molt
what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon
how many spacers we need for 1 ton reinforcement? aprox.
how to convert cement, sand aggregate quantity from M3 to kg with full description?
residential projects,structural.
For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?
what is the most suitable foundation when construct a bird watching tower in a marshy land