how much tempareture are required to make liquid state of
pid leed
No Answer is Posted For this Question
Be the First to Post Answer
How can i display 5 asterisk and another 5 asterisk )?
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
what is concrete canvas?
structural engineering based
how to calculate the density for high density concrete ? or is it same as the density of RC?
how to replace 8mm bar with 10mm bar if the the 8mm bar is not available..???
we are roofing contractors,we are filling a bill in work contract 4.12% method, we collecting 4.12% from our customer but every month we have been paying the vat at 2% from our pocket on the total value of bill. our auditor told me the above method do not collect 2% from the customer side is it true?
Basic questions of civil engineering
0 Answers ONGC, RB Construction,
how to find out spacing inbetween bars instead of 8dia 100c/c to 10dia bars
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
What is quantity of Cement and Sand required for the 1 cum brick masonry with 1:6 Ratio cement mortar.
2 Answers RPP Infra Projects, SIL,
a g+2 building having mezenine floor ,but stair is approching only 1st and 2nd floor, in this case stair is calculate in plinth area for mezenin floor or not?