How manu days after the casting of a slab another slab can
be casted above it?
what is the total curing time of a slab if ponding is not
done on it?
Answer Posted / satishkumar
after 21 days.if ponding is not then 28 days curing reqd it may depends upon season.
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
How many mortar required for Brickwork of 1 Cu.m works??
What is need for setting limits?
if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?
List out some of the software used in the construction sector to estimate cost and monitoring expenses?
reinforcement slab, beam and column formulas?
150mm bricks size how many use 4.14 m3
what does the grad of cement shows (denotes)?
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
What are the types of slump?
what is BPM in concrete demolition hammers. what is better a higher value or lower
For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?
difference between trapezoidal and pedestal footing and how the load acts on that
How to calculate 1 brss for RCC work
why are you joining in this (applied post) job and your aim for this job