How manu days after the casting of a slab another slab can
be casted above it?
what is the total curing time of a slab if ponding is not
done on it?

Answer Posted / satishkumar

after 21 days.if ponding is not then 28 days curing reqd it may depends upon season.

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the release of lien?

698


What is the quantity of cement in mix m20 concrete?

702


What is costing in 100squre feet bricks

1415


When was the first motorway built in england?

654


how to create our resume?

1659






Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?

1730


what is the minimum reinforcement provided in beams,footings,slabs? what is the minimum soil bearing capacity to design a multistorey building

1938


what is the minimum cement content for M20 & M25 as per is code -456(2000).

2712


How much material will consume for following specification water tank (9*7.5*6 feet)?

1629


Which is the best book for building construction?

660


sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you

2010


What are the Types Of DPC and its Thickness used?

962


What is the Unit weight of coarse sand (F.M- 2.20) ?????

1428


is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.

1505


Can rice husk ash be used instead of coal fly ash for manufacture of clc/ foam concrete

2018