What is the role of a PMC(project management consultancy)
in any construction work?
Answers were Sorted based on User's Feedback
Answer / vai
PMC is like a mentor for contractors work reporting it to client. this a kind of assurance which is given to client from PMC tht work done is correct and in order. PMC will c if the work is going according to schedule, look out for any problems which may arise in future... etc..
Is This Answer Correct ? | 57 Yes | 7 No |
Answer / uttam
PMC's primary role is to lead, guide, coordinate and
synchronize the professional inputs from various specialist consultants. It is also includes monitoring, controlling, solving problems, conflicts management and making decisions. His role is multi-disciplinary and his responsibility is to
synthesize and integrate all the aspects of a project into a cohesive whole. The PM role is to lead, guide, steer, inspire, and motivate his entire project team and to marshal all necessary resources to implement and manage tasks and
activities in order to achieve milestones and project deliverables, usually in terms of time cost and quality in order to ensure project success, avoid or reduce project
failure altogether.
Is This Answer Correct ? | 39 Yes | 3 No |
HOW TO MIX M20 GRADE CONCRETE BY HAND? USING BOND.
What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?
insted of bentonite we can use any alternate material in piling ?
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building
who to calculate the bar bending schedule?
what is the method used for marking of cantilevers in hirise buildings by using theodolite
how many shuttering material required for 1000 sq.m built up area.
what is the weight of a cubic meter of M10 concrete?
WILL ANY COLLEAGUE TELL ME THAT WATER RATIO IS FIXED FOR ANY TYPE OF CONCRETE? OR HOW CAN WE DETERMINE THE RATIO OF WATER IN A CONCRETE MIX.
10mm Rebar total 12meters length how to calculate ?
what is the clear cover for shearwall?
What are the main reasons for conducting pull-out tests for soil nails?