What is the role of a PMC(project management consultancy)
in any construction work?
Answer Posted / vai
PMC is like a mentor for contractors work reporting it to client. this a kind of assurance which is given to client from PMC tht work done is correct and in order. PMC will c if the work is going according to schedule, look out for any problems which may arise in future... etc..
| Is This Answer Correct ? | 57 Yes | 7 No |
Post New Answer View All Answers
3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.
What is the different type of slump test indications?
Formula of area of crane hook
how to identify np3 pipe and np4 pipe
What is the general specifications of a bituminous pavement road?
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
What is the likely strength of a 1:2:4 concrete mix?
in the construction of residential building what type of tank are used?where?why & what is its purpose?
Explain what are the problems one might face while having a Cantilever balcony?
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
Pls explain me about tension and compression in a flat slab
what is the list of building construction equipment & teir output?
Would you cause a 55-gallon drum of water to weigh more by climbing in?
in the earthquqke the profile of water on dam is parabolic or not
How many square meter can mason layout chb per hour