What is the role of a PMC(project management consultancy)
in any construction work?
Answer Posted / vai
PMC is like a mentor for contractors work reporting it to client. this a kind of assurance which is given to client from PMC tht work done is correct and in order. PMC will c if the work is going according to schedule, look out for any problems which may arise in future... etc..
Is This Answer Correct ? | 57 Yes | 7 No |
Post New Answer View All Answers
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
can we use PPC for concrete wall, If yes, what is the concrete (PPC & OPC) grade for Non- load bearing concrete wall, load bearing concrete wall & for cellar retaining wall.
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
What type of tensile strength is handling by crank in beam? Thanks.
what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.
What is binding spacing of the rebars at lapping zones.
What is made from large rocks, which protects the base of cliffs?
what is a well
What happens to Load at yielding ?
how to disign cuplock shuttering and it's matireal requirement snd any related web site
Define What glue is least sticky?
List out some of the software used in the construction sector to estimate cost and monitoring expenses?
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
Why joints are provided?
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor