Approximate size of the metal use for normal concrete?
Answers were Sorted based on User's Feedback
Answer / mayank jain
not metal, reinforcement
pcc not required
In rcc
in slab main 16mm transverse 8 mm
in column 12 mm min 4 no of bars in rectangular column
12 mm min 6 no of bars in rectangular column
Is This Answer Correct ? | 3 Yes | 0 No |
1)What's are the diff. types of column based on loading? 2)Is there any difference bitween Development length & Anchorage Length? 3) What is the basic diff. between one way & two way slab? 4) Where should use OPC & where should PPC?
Write down a formula to calculate the number of 50Kg bags of cement for moulding of cement blocks of tcm thick by 20cm high by 40cm long on site with a mix ratio of 1 bag of cement to 3 wheelbarrows of sand . the sand is measured at a STRUCK( WATER LEVEL) 65 litres capacity wheelbarrow. TEL: +237 674630019
sir what is the mean of WBM
What are the Types Of DPC and its Thickness used?
What is the maximum distance between the stirrups?
What is the use of extruded feature in solidsworks?
how can i calculate pcc and rcc cu.mtr rate? specify labor and material cost should be diff
What are causes of cracks in outside plaster of a building and how we prevent it during constructions?
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
How do we calculate absolute pressure?
What is the maximum crushing load in Kg & crushing strength in N/mm2 for M25 & M 15 Grade concrete
1 Answers ECR, RRB, Si Precision Moulds,
providing, fixing, removal of pockets of size 100*150*300mm to 500*600*1000mm for foundation. the shuttering material used for making &fixing of pockets shall be removed by the contractor without damaged to pockets. if any damage occurred, the same shall be rectified by the contractor is to handover the pockets to forge shop engineer with proper marking of centre lines, levels etc.