how much cement,sand,aggregate will use for 1 cum in ratio of
1:2:4.
Answers were Sorted based on User's Feedback
Answer / karim
Quantity: 1cum
Proportion: 1:2:4[M15]
Add 54% extra
[54/100×1]+1=1.54cum
Cement required =1.54/7=0.22cum
We know: 1bag cement=0.0347cum
So, No of bags of cement =0.22/0.0347=6.34bags
Sand required: [1.54/7]×2=0.44cum
1cum=35.347cft
So 0.44cum=15.55cft
Aggregate required =[1.54/7]×4=0.88cum
So,0.88cum=31.18cft
Finally,
[Cement required =6.34bags
Sand=15.55cft
Aggregate =31.18cft]
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / seduraman
m15 1:2:4 (7 parts)
cement 1/7 x 1.57 = 0.225
Sand 2/7 x 1.57 = 0.45
Jelly 4/7 x 1.57 = 0.90
Cement : 0.225 x1440 = 324kg
Total nos of bag of cement : 324/50 = 6.48 Bags of cement
Is This Answer Correct ? | 4 Yes | 5 No |
Answer / huner
v=1c*2s*4G (1+2+4)=7
so for 1 cu m3 1/7= 0.15
the unit weigh of cement =1400 kg/m3
hence for
cement 0.15*1400 =210 kg
sand 2*0.15=0.3 m3
Gravel 4*.15 =0.16 m3
Is This Answer Correct ? | 16 Yes | 18 No |
Cement - 6.38,Sand -2.12cft,Aggregate - 4.59cft
Is This Answer Correct ? | 6 Yes | 8 No |
Answer / er. nirakar behera
Ratio of concrete mix is 1:2:4
we have to calaculate only about the dry volume.
dry density of concrete =14.2qntl/cum
volume of concrete =
1.54/(1+2+4)=0.22cum
Hence for weight of mix ingredients=(14.2qntl/cum*0.22cum)
i.e=3.124qntl
required weight of cement=1*3.124qntl=3.124qntl or say
6.2 bags
for sand =2*6.2cft=12.4 cft
for aggregate=4*6.2cft=24.8cft
Is This Answer Correct ? | 3 Yes | 6 No |
Answer / a.mohammed yahya
For all Common Grade of Concrete Quantity 1Cum fill the
1.57Cum(for 20mm size Jally)
So For the Ratio = 1: 2: 4 (Total = 1+2+4=8)
( there for 1 - Cement,2- sand,3- 20mm Size Jelly)
Calculate for Cement = 1/8 = 0.125
= 0.125 x 1.57
= 0.196
For Common 1Cum Cement Quantity = 1440kg
there for = 1440 x 0.196
Required Cement = 282kg
Calculate for Sand = 2/8 = 0.25
= 0.25x 1.57=0.393Cum
= 0.393 x 35.32
Required Sand =14 Cft
Calculate For Jelly = 4/8 = 0.5
= 0.5 x 1.57
= 0.79Cum
Required Jally = 0.79 x 35.32 = 28 cft
Is This Answer Correct ? | 24 Yes | 33 No |
how much quantity of cement(bags)concrete(20mm)and sand(sqft)is used in 1:3:6 PCC
15. List 3 of your weakest points as a worker?
What are the Tests required to check the Quality of bar?
Define current ucs?
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
how much quantity of mortar required for cement pointing work?
0 Answers City Corporation, Pragya Construction, Simplex,
how to estimate plastering quantity if the given object is in circular. 12 mm thick both side 1:3 example= i have 8.15 m2 how to estimate quantity
how many binding wire can be required for 1 metric tonne steel?
crank types
WBM Road aggregates quantity calculation
What is unit weight of normal concrete?
what is the density of Coarse Aggregate in 1 cu m of Concrete?