how much cement,sand,aggregate will use for 1 cum in ratio of
1:2:4.
Answer Posted / seduraman
m15 1:2:4 (7 parts)
cement 1/7 x 1.57 = 0.225
Sand 2/7 x 1.57 = 0.45
Jelly 4/7 x 1.57 = 0.90
Cement : 0.225 x1440 = 324kg
Total nos of bag of cement : 324/50 = 6.48 Bags of cement
Is This Answer Correct ? | 4 Yes | 5 No |
Post New Answer View All Answers
What is the difference between chamfer and fillet?
How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?
what is cross hair cursor?
Civil engineering material testing Standard results
which method is used in semi-rigid connection design??
WHAT IS YOUR CURRENT SALARY
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
How to find out slope footing concrete
WAP to print 1) 1 1 1 1 1 1 1 1 1 1 2) 1 2 3 4 5 6 7 8 9 10
Why nautical mile is different from statute mile?
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?
Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.
Which are the top apps for you civil engineering?
How to marking the building