a)If column dimensions are 250*400mm , what will be
cutting length for 8mm stirrups and how to calculate it? b)
If beam dimensions are 200*400mm , beam coveris 25mm , slab
cover is 20mm , what will be the cutting length for
stirrups? c)Column dimensions are 250*400mm , reinf. is
12nos. bar of 16mm dia , stirrups provided are two legged,
what will be the length of each ring?
Regards
Answers were Sorted based on User's Feedback
Answer / er shailesh kr srivastava
A)CUTTING LENGTH FOR 8mm Strips=2(250+400-2*80-2*8+24*8)
2(650-160+22*8)
2(490+176)
=1332mm
same as for beam
| Is This Answer Correct ? | 6 Yes | 9 No |
Answer / ajay
sir , my name ajay kumar ,working on site i also had the
same problem of estimation , but sir ur answer was so nicely
explained , im very thank full to u for ur valuable and
precious information, sir can i no ur email id and no so i
can get some knowlege from u ?
my email -ajaykapse2@gmail.com
| Is This Answer Correct ? | 6 Yes | 10 No |
Answer / ram bhawan
2(A+B)+16*DIA OF STIRRUP BAR
A = INNER HEIGHT OF STIRRUP
B = INNER BREATH OF STIRRUPS
IF CLEAR COVER IS GIVEN (COVER GIVEN FROM STIRRUP NOT FROM
MAIN BAR)
| Is This Answer Correct ? | 2 Yes | 9 No |
Answer / silpa
250-25+8=233mm,
400-25+8=383mm
2(0.233+0383)+16*0.08=2.512m
| Is This Answer Correct ? | 9 Yes | 32 No |
Answer / anthony victor bernard
a)250-column cover both side+8*dia of rod
400-column cover both side+8*dia of rod
so cutting length is (.200+.350)*2+(2*5*.008)
=1.180 mts
(b)cutting length is (.150+.355)*2+(2*5*.008)
=1.090 mts
(c)cutting length is (.100+.350)*2+(2*5*.008)
=0.980 mts
| Is This Answer Correct ? | 11 Yes | 38 No |
a)250-column cover both side+8*dia of rod
400-column cover both side+8*dia of rod
so cutting length is (.250+.400)*2-.160+.128
=1.268 mts
same as (b)
| Is This Answer Correct ? | 37 Yes | 65 No |
If I want to lab 16 mm dia. bar with 20 mm dia bar with 40D lap length which dia.should I consider for lapping
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
what is permissible IRC limits of silt content in river sand in India
what will do when 7days concrete has failed and structure has constructed?
strength vs shape factor
calculate the quantity of water for 1:6 cement mortar
0 Answers Pratibha Industries,
How high should the water tank be to provide a 60 psi at base of this water tower?
construction workers how much time take one work or qty
time and work questions
Rigid pavement Load in tyre preesure It Means KG
In few lines, please be elaborative on extras and talents that make you a potential candidate for the post:
how many shuttering material required for 100 sqm
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)