a)If column dimensions are 250*400mm , what will be
cutting length for 8mm stirrups and how to calculate it? b)
If beam dimensions are 200*400mm , beam coveris 25mm , slab
cover is 20mm , what will be the cutting length for
stirrups? c)Column dimensions are 250*400mm , reinf. is
12nos. bar of 16mm dia , stirrups provided are two legged,
what will be the length of each ring?
Regards
Answers were Sorted based on User's Feedback
Answer / santosh singh
1) let cover for column be 40mm (as u have not mentioned)
formula to determine cutting length of stirrup is given below
cutting length= (2A+2B)+(24D)
A=LONGER LENGTH OF COLUMN-2XCOVER=400-40X2=320MM
B=SHORTER LENGTH OF COLUMN-2XCOVER=250-40X2=170MM
D= DIAMETER OF STIRRUP BAR IN MM
therefore
cutting length=2X320+2X170 + 24X8 =1172MM=1.172 meter
2) given cover 25mm (as u have mentioned)
formula to determine cutting length of stirrup is given below
cutting length= (2A+2B)+(24D)
A=LONGER LENGTH OF BEAM-2XCOVER=400-25X2=350MM
B=SHORTER LENGTH OF BEAM-2XCOVER=200-25X2=150MM
D= DIAMETER OF STIRRUP BAR IN MM
therefore
cutting length=2X350+2X150 + 24X8 =1192MM=1.192 meter
NOTE SLAB COVER HAS NOTHING TO DO WITH CAL.OF STIRRUPS
3) ASSUME cover 30mm (as u have NOT mentioned)
formula to determine cutting length of stirrup is given below
cutting length= (2A+2B)+(24D)
A=LONGER LENGTH OF COLUMN/2 -COVER=400/2-30=170MM
B=SHORTER LENGTH OF COLUMN-2XCOVER=250-30X2=190MM
D= DIAMETER OF STIRRUP BAR IN MM
therefore
cutting length=2X170+2X190 + 24X8 =912MM=0.912 meter EACH
NOTE I HAVE CONSIDERED 8MM DIA STIRRUP BAR EVERY WHERE
UPTO 12MM DIA BARS CAN BE USED AS STIRRUPS GENERALLY
i am a civil engineer. if u r a civil engineer i think u should
by a bookits name is
estimation and costing by B.N.DUTTA u will get alot of
information through this book ....i think no one has been able
to explain the correct method ....good luck
Is This Answer Correct ? | 245 Yes | 60 No |
Answer / md gyasuddin ahsan
a) let the cover 40 mm.in column,then
cutting length of ring is= 2*(170+320)+2*10*d-10*d
where hooks are= 10d+10d
deduction bend=2*5*d=10d
so length is =1060 mm
Is This Answer Correct ? | 102 Yes | 30 No |
Answer / manish
a) Column size= 250*400,
so, L=250, B=400, cover = 40mm, bar dia 8mm
Cutting length of stirrups
= 2(L+B)-(8*cover)+(2*10d)-(1.5d*nos of bends)
(2*10d) is for 2hooks,
1.5d is deduction for elongation at each bend
Calculation =2*(250+400)-(8*40)+(2*10*8)-(1.5*8*5)
Cut length= 1080 mm.
Is This Answer Correct ? | 48 Yes | 19 No |
Answer / jaikumar
If Cutting length of ring is 250-40*2=170
400-40*2=320
Total =170+320*2=980mm+hook calculate 10*8+80
We elongation on the 8mm rod
minus =980+96+96=1172-5*8
1172-40=1132 mm
Is This Answer Correct ? | 25 Yes | 8 No |
Answer / shashank
IN CASE OF COLUMN-
DIM.-200X400mm
CONCRETE COVER-
FOR COLUMN THICKNESS <250mm=25mm
FOR COLUMN THICKNESS >250mm=40mm
LENGHT OF TIE- 2A+2B=2X200+2X400=1200mm
NOW DEDUCT CONCRETE COVER-LENGTH OF TIE-COCNRETE COVER=1200-
2X40=1120MM
ALSO, DEDCUT BENDS- 2D FOR 45degrees
D FOR 90degrees
THEREFORE- CUT LENGTH OF TIE-1120-DX5=1120-2X8=1104mm(NO.
OF BENDS -5 )
Length of Hooks=10d=10x8=80MM
NO. OF hooks=2
Therefore-Length of Hook=2x20=160MM
CUTTING LENGHT OF BAR=1104+160=1264MM=1.264m
Is This Answer Correct ? | 30 Yes | 19 No |
Answer / ajit umakant
A)CUTTING LENGTH FOR 8mm Strips=2(250+400)-(4*40)+(2*10*8)-(2*5*8)
=1300-160+160-80
=1220 mm
Is This Answer Correct ? | 17 Yes | 6 No |
Given Data : Column size = 250x400 Clear Cover = 40 mm Dia of Stirrup = 8 mm
Ans: To calculate cutting length first we determine the lengths A and B
So A = 250-2x40+2x(half dia of stirrup) = 250-80+2x4 = 178
B = 400-2x40+2x(half dia of stirrup) = 400-80+2x4 = 328
Deductions : For bents up we must deduct the values that for
45 degree bent = 1d
90 degree bent = 2d
135 degree bent = 3d where d = dia of stirrup
here in our case for the hooks there are 2 bends of 135 degree each
for the stirrup there are 3 bends of each 90 degree
so deductions = 2x3xd + 3x2xd = 2x3x8 + 3x2x8
Addings up ---> we have to add up hook lengths here in our case each hook length = 12 d so for 2 hooks the hook length = 12d+12d = 24d
So now the actual cutting length = 2(A+B)-2x3x8-3x2x8+24x8
= 2(178+328)-2x3x8-3x2x8+24x8
= 1012-48-48+192 = 1108 = 1.108 m.
Note : It is only correct answer I assure to you all which will be the elsewhere worthwhile in whole india you can check up
Is This Answer Correct ? | 10 Yes | 0 No |
Answer / santosh deora
as per IS 2502
cutting length for rectangular ties will be 2A+2B+24d
where A & B inside dimension of stirrup, d dia (8mm)of bar
for column size 250x400 , nominal cover 40mm,
A = 250-80-16 = 154
B = 400-80-16 = 304
cutting length = (2x154)+ (2x304)+ (24x8)
= 1108
Is This Answer Correct ? | 11 Yes | 4 No |
Answer / pravin k
A)CUTTING LENGTH FOR 8mm Strips=2(250+400-2*80+2*10*8-2*5*8)
=1140+160-80
=1280 mm
Is This Answer Correct ? | 14 Yes | 8 No |
what is rolling margin of steel
how water proof chemicals act in concrete to avoid leek?
0 Answers DDF Consultants, NSL,
Calculate the quantity of concrete for the following. 2 Under-reamed cast in situ pile of 300 mm dia. of 10.00 m length.
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com
Q1) I am having an interview in a construction company for a large sewage project . Since I have not done any such project , there are some queries from my end. Pls. help me to solve them. I will be thankful to you :- a) Normally for large project 400-600 houses & around 1600 peoples , how much dia pipe is used and which type of pipe is used? b) For trenching , I have heard that IS 1200 implies, what are the rules of calculating earthwork in case of depth of 2m or above ? c) To prevent soil to fall when depth of trench is more , what steps are taken and how there qty. is calculated . Like I have heard about timbering . what is this ? d) What are the rules for disposing off the excavated soil ? e) How the pipes that are used are being jointed? f) In case of cleaning on choks , is there any intermediate things provided? g) For foul gases any outlets are provided thru out length of pipeline? h) What is the flow digram like from houses thru small pipe to main pipeline than where main pipeline disposes wastage ? i) Any other thing that has to be kept in mind while calculating earth work for excavation like steps are made and other things? How earthwork is calculated in case of steps ? Pls. explain with a sketch. Regards,
What is green building?
why only water cement ratio always......why not water sand ratio while making concrete
How to convert aggregate and sand from kgs to ltrs ?
Where on net can i find IS Codes?
Dear Sir What is the Contraction joint for base Slab
How to calculate crank length? How to calculate hook length?
Characteristics of a model project are ––