Answer / sachin kumar
AS PER CPWD NORM ICUM CONTAIONNS 484NO. BRICK SIZE OF 9"X4.5"X3"....
| Is This Answer Correct ? | 4 Yes | 2 No |
Answer / prakash kumar pati
500 bricks may be right but we have to substract the vol of
sand cement & aggregate
| Is This Answer Correct ? | 3 Yes | 1 No |
Answer / m faizan khokhar
hy friends in1cft bricks are used 13.5 bricks amd i cu.m bricks are used 500
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / er. pravin chuadhary
As per indian standard brick size is 190x90x90 mm, by considering 10mm morter each side the size of brick should be 200mmx100mmx100mm, volume of one brick= 0.2x0.1x0.1 = 0.002 cum now no. of bricks per cum = 1/0.002 = 500nos, no total volume of bricks only in 1 cum = 500x(0.19x0.09x0.09) = 0.7695 cum, so total volume of morter in one cum = 1-0.7695 = 0.2305 cum. so, in 1 cum of brick Masonary contains 500 bricks, and 0.2305 cum morter.
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / rohtash sharma
1cub meter no of bricks
standard size is 19cmx9cmx9cm
=0.00154
so 1 / 0.00154
Total No's of brick 1 m3=649nos.
second .2x.1x.1= 0.002
so 1m3= 1/0.002= 500 No's.
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / akil ahmed
500 bricks beacuse stanard size of brick with morter is
20x20x10mm
| Is This Answer Correct ? | 4 Yes | 3 No |
Answer / shruti
In practical work Brick Size found 254 mm x 127 mm x 76.2 mm
Than Volume of 1 Brick = 0.254 X 0.127 X 0.0762 = 0.002458 Cum
Therefore No of Bricks per 1 Cum = 1 / 0.002458
= 406.83 nos Say 407 Nos
| Is This Answer Correct ? | 2 Yes | 1 No |
Please explain soil invistigation methods?
say you are requsituoning cement to build masonry wall made of burnt clay bricks. how many 50 kgs cement bags will you requisition for 1:5 ratio mortar joint, if they masonry wall volume is 10 m3
Using 1 lit paint how many sq.ft of wall we can paint. Thanks.
how much steel provide in 1m cube r.c.c
I want to know about rolling margin of steel :- For eg. If 2nos. bundle of 8mm dia steel with17 rods each of length 12m comes to store. During testing of 1m rod of each bundle it was found that 1rod has weight .405kg/m while other has .385kg/m. Now what will happen in case of steel payment and measurement payment ? Regards,
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.
how to calculate the steel quantity for columns and beams
What is different between DI Pipe and CI pipe?
What are the different types of foundation?
Can anyone give me the thumb rule for calculating the time required for construction based on quantity of concrete, Reinforcement, shuttering, etc
1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.
0 Answers Gammon, Rajiv Gandhi University of Knowledge Technologies RGUKT,
How high should the water tank be to provide a 60 psi at base of this water tower?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)