Can anyone give me the thumb rule for calculating the time
required for construction based on quantity of concrete,
Reinforcement, shuttering, etc
No Answer is Posted For this Question
Be the First to Post Answer
what is the formula to calculate costing of rubble soling and wbm in road works?
How can we improve the capacity of a existing foundation?
how to shuttering is used in slab
how many average of shuttering in one cubic meter concrete
What is thumb rule in quantity and cost estimation of a residential building in civil engineering??
0 Answers Ascent Constructions,
What is the m25
6 Answers Itd Cementation India, L&T,
why development length = 50D . why not 100D
What the codes used for Rigid Pavement and Flexible pavement.
what is the maximum number of course that can be laid according to IS code and the max height.
how to convert sand from Cum to Brass
what type of qustions can i expect from soil mechanics
how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)