What are the delays in construction projects due to
approvals from owners? How can we analyze them in different
prospective? Whats their affects and effects on presently
going work?
No Answer is Posted For this Question
Be the First to Post Answer
how to find number of 16mm bar reqired for 5m length with 125 mm spacing ?
what are RIB slabs explain about it
Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in
What is the stripping time of shuttering for PPC concrete
1.why can't we used sea sand in construction? 2.can we change sea sand into normal sand? if yes how?
how many rods to be require in kg 10sq.m slab?
1 cft concrete equal how many kgs
How to do lineout of building
wat is fe full form in fe4l5?
what is the unit weight of steel(kg/cum)& unit weight of concrete in(kg/cum)?
How to compute minimum number of columns required for a site from area of site?
what is conrete grade ,how are depent on concrete grad and size of concrete?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)