What is the stripping time of shuttering for PPC concrete
Answer / sjtbehera
What is mean by stripping. If you ,mean deshuttrring, then it wii 14 days to keep
Is This Answer Correct ? | 0 Yes | 0 No |
1:4:6 grade 15.84cum and how much cement and sand aggricate are used
1 Answers Minartech Developers,
how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )
how to calculate 1:2:4 ratio concrete cement, sand, metal and water please give me brief calculation
34 Answers Call Centre, CCCL, Oracle, RLM, RPP, Sunanda Infra, Sunrise Enterprises,
As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.
What is the basis of choice for cement sand plaster in ratio 1:4 and 1:6 on interior walls of a residential apartment.
What is indicate Fe250 in steel structure?
Gidc technical que paper
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
what is the least count of staff ?
how to calculate the amount of cement & sand required for plastering
how much anti termite treatment( ATT) liter used in one sq mtr floar area? & what is ratio of ATT & water.
Is bulkage is considered in crushed sand? if yes..then what is the percentage ??