what are RIB slabs explain about it
No Answer is Posted For this Question
Be the First to Post Answer
What is the difference between first angle projection and third angle projection?
9 Answers CLG, Elecon, JTEKT, Nagarjuna Construction,
during site visit if i find voilation going on,what can i do,how i act?
How to calculate the Water cement ratio of reqiured compressive Strength of concrete?
Why silt content not allowed more than 6% for Sand ?
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
Deshuttering time for slab 6.15 meter
why we designed limit state method?
pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width
The corrosion resistance of a material is.
What is the thumb rule for calculating the number of chairs in slab?
What will be the crank length in an staircase is same like an slab?
why we are condecting the slump test for concrete?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)