what is plate load test and what is the procedure of it and what is accessories which in use

Answers were Sorted based on User's Feedback



what is plate load test and what is the procedure of it and what is accessories which in use..

Answer / waheed

plate load test is used in case of finding the bearing
capacity of a soil at a required depth

Is This Answer Correct ?    19 Yes 3 No

what is plate load test and what is the procedure of it and what is accessories which in use..

Answer / furqan

What mr waheed said is correct. Its used to know the bearing capacity of soil with loading plates of different sizes on the actual site. The procedure is that you will need the instrument with JCB and at least 2 worker. You have to fix the plate on the specific land or place. Fix all the guages. Then apply the load on plate by jcb and take the reading on machine. You can search on youtube

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

Respected sir i am appearing for the exam this year.I will be highly obliged if u kindly send me last year's interview paper on civil engineering in my email address debosmitroy@yahoo.in

1 Answers  


what type offoundation suitable for clayey type soil

2 Answers  


Till how many days can we keep a cement bag without using? And on what conditions the cement will get spoiled?

4 Answers  


what is slope provided to floor?

3 Answers   Tulip,


What do you mean by bond? What are the different types of bonds?

0 Answers  






how should i calculate the concrete volume in a circular RCC wall ? what is the formula pls add diagram link for explaing

1 Answers   Private,


How To do Steel Design of Beam,Columm,Slab,Staircase,Wall?

1 Answers   Aditya Structurals,


can we use .5 water-cement ratio for any type of cement?

7 Answers  


How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?

0 Answers  


What is approximate % of wastage considered for Marble and vitrified tiling works (flooring)?

3 Answers  


relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2

1 Answers   Infosys, SSC,


What is a Quick Sand?

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)